We're firing tomorrow. It's the last firing of the year so of course I tried to squeeze everything in, especially the favourite pieces for the show on the 21st. Very frustrating when many of them didn't fit in. Fingers crossed for a good one.
Tuesday, November 10, 2015
Thursday, September 24, 2015
A Few Pots From The September Firing
There were fairly heavy losses in this firing. Too hot, too fast, so lots of ash glaze runs, bloating etc. Here are a few of the better ones. I'm trying rattan/cane handles as the solid cane have become so expensive. This is a first try so I'm not sure about them. I'm thinking the round reed might look better dyed a warmer brown - maybe next time.
![]() |
| Coarse clay basket with thick slip |
![]() |
| Teadust Temmoku teapot |
![]() |
| Red Shino Teapot |
![]() |
| Ash glazed teapot |
![]() |
| Ash glazed nesting bowls |
A friend introduced me to Matcha recently so I've made some bowls for it.
![]() |
| Tea bowls - 2 shino, 1 ash. |
![]() |
| Teadust temmoku teabowl |
![]() |
| Some dishes |
Monday, September 14, 2015
Another Firing
We fired yesterday and all went well. Good dry wood, clouds instead of a hot, sunny day like the day before. Hopefully results will be good. When I was loading the 2nd from the top shelf in stack 3 the posts underneath rotated and there were posts and pots all over the place! Scary and infuriating. Posts shattered two of the mugs on the floor and various pots had scuffs in the glaze which I touched up. I only hope there were no cracks hidden under the glaze. Unloading is on Wednesday or Thursday. Fingers crossed.
![]() |
| Stack 3. |
![]() |
| Last hour or so of the firing. |
Monday, September 7, 2015
Assembled
Wednesday, September 2, 2015
Countdown
Last day to throw today so quickly did a few oil bottles, some garlic pots, olive bowls and 2 teapots to fill in the gaps. Tomorrow will be assembling and handles etc. Then quick, quick drying, I hope, (no cracks please) for a firing on the 14th.
![]() |
| Today's work. |
![]() |
| Half dry pots. |
![]() |
| Barely dry mugs. |
![]() |
| Partly loaded bisque kiln. |
Monday, August 10, 2015
Culture Tour
We took a day off yesterday and headed for the Slocan Valley and the Columbia Basin Trust Culture Tour. It's a long drive from here so we narrowed it down to 2 potters studios, Cameron Stewart's and Robin DuPont's, so we would have time to really look and to talk pots a bit. Cam Stewart had Lisa Christie and Pamela Stevenson as his guests so there were 4 potters to visit with. A great day and a good break from making. I left a couple of pieces behind that I wish I'd bought so am hoping they're still available. Lesson learned - don't hesitate!
![]() |
| Cam Stewart's handbuilt, delicate little mug. |
![]() |
| Lisa Christie's unomi/on the rocks cup. |
![]() |
| Robin DuPont's porcelain bowl. |
![]() |
| Robin DuPont stoneware bowl. |
Wednesday, August 5, 2015
Gearing Up
I'm on a roll, gearing up for a firing as soon as it rains. I'm going to have the kiln loaded and ready to go as soon as we get several days of steady downpour. This abnormally long spell of dry, hot weather has got us all a bit nervous. 100's of fires in British Columbia and I don't want to be contributing to them.
So pots are drying on their heads/faces and more are coming. Made teapots today that I'll assemble tomorrow.
![]() |
| Soup/cereal bowls |
![]() |
| Big salad bowl |
![]() |
| Basket serving dishes |
![]() |
| Upside down big bell vase inspired by a bell played at the local Zendo Ceremony |
![]() |
| Detail |
Subscribe to:
Posts (Atom)



























